Logo X-Fleet
Logo X-Industry
Logo X-Data

Let’s Talk

INDUSTRY · TERTIARY · BUILDINGS

Metering, diagnostics and certification for your plant.

Metering, diagnostics and certification for your plant.

Bring together consumption, bills and facility data to analyse energy use, identify efficiency opportunities and gather the evidence needed for CAE certificates.

Instalación industrial con conductos amarillos y tarjeta de datos de eficiencia
Instalación industrial con conductos amarillos y tarjeta de datos de eficiencia

Plants and Portfolios working with us

Plants and Portfolios working with us

SERVICES

We meter the plant, quantify every opportunity in €/year, execute the engineering, and certify what qualifies under the MITECO catalogue.

We meter the plant, quantify every opportunity in €/year, execute the engineering, and certify what qualifies under the MITECO catalogue.

Edificio industrial y técnico en una sala de control
Edificio industrial y técnico en una sala de control

Submetering and monitoring

Power quality and predictive maintenance

Tariff and demand forecasting

CAE certification

Footprint and CSRD reporting

SUBMETERING

We Meter Every Process, Not Just the Main Feed

A nested submetering tree from the main meter down to refrigeration, compressors, production lines and lighting, at quarter-hourly resolution.

Paneles de submetering: árbol de consumos y comparativa de días laborables y festivos

What doesn't add up, we declare

Whatever the submeters don't cover is shown as unmetered main-feed load, not spread across processes to make the total close at 100%.

Árbol de submetering con consumos por línea
Árbol de submetering con consumos por línea

Energy per tonne produced

Intensity in kWh per tonne with a monthly trend. Sites that don't declare output say so, rather than inventing the ratio.

Indicador de intensidad energética en kWh por tonelada

POWER QUALITY

Electrical signals to guide technical review

Available electrical data helps identify variations and prioritise reviews. The cause of an anomaly requires measurements to be assessed in the facility’s operating context.

Panel de salud de la sala de compresores con armónicos y desequilibrio

A signal worth investigating

A persistent change may warrant inspection. A harmonic measurement alone cannot identify a fault in a specific component.

Gráfico de indicadores de salud de equipos
Gráfico de indicadores de salud de equipos

Data to prioritise maintenance

Relating consumption to equipment incidents helps guide maintenance reviews. Diagnosis remains the responsibility of the relevant technical personnel.

Alerta de mantenimiento predictivo en la sala de compresores
Alerta de mantenimiento predictivo en la sala de compresores

TARIFF AND FORECASTING

The Fastest Money Needs No Capex

More than 500 clients, over 1,000 dossiers processed, over 150 GWh of certified energy savings, over 18,200 vehicles analysed, more than 1.6 million tonnes of CO₂ emissions avoided and over 20 million data points processed every month. Our commitments: an in-house technical team with equal opportunities and ongoing training, supplier relationships based on environmental and social criteria, and activities that deliver measurable emissions reductions.

Panel de consumo energético mensual sobre una imagen de camiones

Forecasting with its error on screen

Seven-day demand forecasts published together with the model's error, so you can decide whether to trust them before you act.

Alerta de fuga de agua detectada en un centro logístico

Identify water use that needs investigation

Consumption outside operating hours may indicate a leak or another unexpected use. The cause should be checked on site before quantifying a loss.

Gráficos de consumo nocturno del centro logístico de Riba-roja

CAE CERTIFICATION

Engineering Expertise, Managed In-House

Our own team runs the calculation with each measure's official formula, the signed dossier, and the filing with the regional authority.

Estudio acumulado de ahorro térmico en kWh al año

FOOTPRINT AND CSRD

One Inventory Feeds Every Report

Scopes 1 and 2 under Royal Decree 214/2025, dual electricity accounting, a five-year reduction plan, and ESRS E1 datapoints in auditable format.

Documentos generados: informe de sostenibilidad, inventario GEI, formulario MITECO y datos ESRS

METHODOLOGY

Work cycle, phase by phase.

PHASE 1

Metering and technical diagnosis

We bring together consumption, bills and facility data to understand how energy is used. We identify measurement needs before assessing improvement opportunities.

We bring together consumption, bills and facility data to understand how energy is used. We identify measurement needs before assessing improvement opportunities.

PHASE 2

Regulatory tin

We review each improvement and its documentation to determine whether it fits a current CAE standardised measure or needs a specific assessment. Eligibility is assessed for each measure.

We review each improvement and its documentation to determine whether it fits a current CAE standardised measure or needs a specific assessment. Eligibility is assessed for each measure.

PHASE 3

Engineering and M&V

We define the baseline, required data and calculation method. Measurement and verification provide the evidence for savings attributable to the improvement.

We define the baseline, required data and calculation method. Measurement and verification provide the evidence for savings attributable to the improvement.

PHASE 4

Agreement and verification

We prepare the evidence and terms for transferring the savings. An accredited verifier assesses the file, and we address any technical clarifications requested.

We prepare the evidence and terms for transferring the savings. An accredited verifier assesses the file, and we address any technical clarifications requested.

PHASE 5

Regional filing

Once the savings have been verified, the application is organised through the applicable channel with the competent authority. Documents and processing progress are kept together.

Once the savings have been verified, the application is organised through the applicable channel with the competent authority. Documents and processing progress are kept together.

PHASE 6

Issuance and settlement

We track CAE issuance and the agreed settlement. Results are documented to connect the measure, verified savings and financial outcome.

We track CAE issuance and the agreed settlement. Results are documented to connect the measure, verified savings and financial outcome.

DIFFERENTIALS

What makes us different?

One Partner From Audit to Certificate

One Partner From Audit to Certificate

Clear commercial terms

The scope of the savings transfer and payment are defined in each project agreement.

One Asset. More Than One Outcome.

Reuse the same data for CAE, carbon footprint, and CSRD.

We Never Invent a Zero

Missing data is declared, not padded with an average value.

We Measure, We Don't Estimate

Process allocation comes from meters, not catalogue percentages.

Track variations

Data helps identify changes that require a technical review of the facility.

APPLICATION CASES

Where this applies.

Food and beverage industry

Food and beverage industry

Analyse refrigeration, process heat and production-line consumption alongside activity levels to identify efficiency opportunities.

Estanterías de un supermercado: sector retail

Chemical and pharmaceutical industry

Chemical and pharmaceutical industry

Organise energy data from processes and utilities to assess improvements while considering each facility’s operating conditions and technical requirements.

Cápsulas farmacéuticas: industria farmacéutica

150+ GWh

150+ GWh

Connect consumption, bills and operating hours to review heating, cooling, lighting and contracted power across a building or property portfolio.

Interior de oficinas: sector terciario

1.6 M+ t CO₂

1.6 M+ t CO₂

Assess the energy used for heating, cooling, hot water and other hotel services, taking occupancy and seasonality into account.

Habitación de hotel: sector terciario

Cold storage and logistics

Cold storage and logistics

Track cold-room, refrigeration-equipment and site consumption to identify variations and document operational improvements.

Operario con chaleco reflectante en una planta industrial

COMPLIANCE

Is your quadrennial energy audit up to date?

RD 56/2016 requires large companies to audit at least 85% of their consumption every four years, and refrigeration and electrical installations carry their own inspection cycles. With the plant submetered, the audit stops being a report that gets filed away and becomes the starting point of a plan with numbers attached.

Check my deadlines

Inspección térmica de motores y tuberías en una instalación industrial

Organised data to plan and document your reviews.

Organised data to plan and document your reviews.

FREQUENTLY ASKED QUESTIONS

Common technical questions.

¿Cómo puedo obtener el informe de auditoría de 2025?

Escribe a info@certexinnova.com con el asunto «Informe de auditoría 2025», indicando tu organización y el motivo. Revisamos la solicitud y enviamos el informe del auditor y las cuentas anuales del ejercicio 2025. No hay descarga pública.

¿Qué documentación facilitáis para homologarnos como proveedor?

Datos societarios, cuentas anuales auditadas, certificados y políticas de privacidad y cumplimiento. Indícanos los documentos y el plazo que exige tu proceso de compras y te los enviamos revisados.

¿Cómo puedo comunicar una preocupación sobre integridad?

Escribe a info@certexinnova.com con el asunto «Integridad». Las comunicaciones se tratan de forma confidencial y todas reciben respuesta.

¿De dónde salen las cifras de clientes, MWh y toneladas?

More than 500 clients, over 1,000 dossiers processed, over 150 GWh of certified energy savings, over 18,200 vehicles analysed, more than 1.6 million tonnes of CO₂ emissions avoided and over 20 million data points processed every month. These are Certex’s corporate figures and are updated periodically.

¿Quién es el responsable del tratamiento de mis datos?

CERTEX INNOVA S.L., CIF B19773944. La política de privacidad detalla finalidades, bases legales y cómo ejercer tus derechos. El contacto para protección de datos es info@certexinnova.com.

¿Certex está vinculada a fabricantes o comercializadoras?

Recomendamos actuaciones por su ahorro medible, no por el proveedor que las ejecuta. Las condiciones económicas de cada proyecto quedan por escrito antes de empezar.

¿Dónde está la sede y cómo contactar?

Camí de Can Ametller 24, Edificio 2, Planta 2, 08195 Sant Cugat del Vallès (Barcelona). Teléfono +34 932 204 162 y correo info@certexinnova.com.

CONTACT

Shall we talk about your assets?

Let’s review consumption, bills and facility data to identify efficiency opportunities and assess which savings can be documented.

Let’s Talk

Emblema X de Certex con imágenes de una planta industrial

A regulatory technology platform for energy efficiency and corporate decarbonization. End-to-end CAE origination, carbon footprint and CSRD/ESG reporting on one data layer.

© 2026 Certex Innova, S.L. All rights reserved.

A regulatory technology platform for energy efficiency and corporate decarbonization. End-to-end CAE origination, carbon footprint and CSRD/ESG reporting on one data layer.

© 2026 Certex Innova, S.L. All rights reserved.

A regulatory technology platform for energy efficiency and corporate decarbonization. End-to-end CAE origination, carbon footprint and CSRD/ESG reporting on one data layer.

© 2026 Certex Innova, S.L. All rights reserved.

A regulatory technology platform for energy efficiency and corporate decarbonization. End-to-end CAE origination, carbon footprint and CSRD/ESG reporting on one data layer.

© 2026 Certex Innova, S.L. All rights reserved.